We continue to check items off our list and prepare the experiment for shipping to Antarctica. In the morning, our SIP was removed from the gondola, so now we are operating through the SIP simulator. This afternoon, Michele, Kyle, Jeff, and I removed the two mirrors from the gondola as they are no longer needed for any of the tests we plan to do. Shaul, Michele, and I then did a full and thorough test of our lock pin system after Shaul and Joy spent some time in the morning figuring out some of the preliminaries.
Pictures:
https://picasaweb.google.com/104253244018605213307/EBEXInPalestine20120822
Wednesday, August 22, 2012
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.