It has been a long week here in the high bay for Kyle and myself -- but more so for Kyle. He has been on the late shift, getting in at about 3PM and working until 4, 5, or 6AM taking scans, babysitting fridge cycles, and analyzing data. It has taken its toll, and we're both looking forward to being done with this phase of the experiment.
Today was, of course, more scans, one of which seemed to be a waste of time (low signal-to-noise), the other quite reasonable. We tried to start taking another scan, but in the interests of Kyle's health and sanity, we are fridge cycling 'early' (which means Kyle will be in bed by 3AM!) and we will take the last of this calibration data tomorrow. After that, we break down the instrument (move the Ebert-Fastie, disconnect cables, etc) in preparation for the cryostat going on the gondola Saturday morning.
Britt and Michele finished Bemco'ing the power system, which passed with no problems (as expected based on the specs of the components). Kevin put Cynthia to work fleshing out our focal plane visualization tool, which will be nice to have soon! I also started work on a filter box to clean up the power coming out of the bolo system DC/DCs.
Pictures:
https://picasaweb.google.com/104253244018605213307/EBEXInPalestine20120712
Thursday, July 12, 2012
Wednesday, July 11, 2012
Day 45, 7/11/2012 -- Nearing full integration
Today I managed to take some crucial data, that of our polarization modulation efficiency -- how well does our receiver act as a polarimeter. Pretty darn well, it turns out! But I spent too much time in the morning trying to get some spectral data on one of our 410GHz detectors without much luck -- hopefully Kyle will have success doing scans during the late shift.
Britt and Michele successfully tested our elevation actuator and our inner frame lock pin actuator in the Bemco. The power system (charge controllers, batteries, and power distribution boxes) are on the agenda for tomorrow.
Tomorrow will also likely be the final day of cryostat-only tests -- we're hoping to have the cryostat put on the gondola by the end of the week!
No pictures today (I was too busy!).
Britt and Michele successfully tested our elevation actuator and our inner frame lock pin actuator in the Bemco. The power system (charge controllers, batteries, and power distribution boxes) are on the agenda for tomorrow.
Tomorrow will also likely be the final day of cryostat-only tests -- we're hoping to have the cryostat put on the gondola by the end of the week!
No pictures today (I was too busy!).
Tuesday, July 10, 2012
Day 44, 7/10/2012 -- Groovin'
It's amazing how much data one can take when things actually work and you can get in the groove. We did more scans of another wafer today, and when one gets massive signals it's easy (and quick) to take data. We did 4 or 5 separate scans today, both with and without the half-wave plate rotating. During the scans, Kyle worked more on his analysis code (after he arrived at the high bay in the afternoon), I helped Kevin fix some DfMUX boards and helped Shaul analyze some data taken back in MN, and Kate and Kyle continued working on understanding our bolometers.
On the gondola side, Britt and Michele started setting up hardware in the Bemco for a test of the new power system's electronics and batteries. In addition, they are going to test the inner frame lock pin and the spare elevation actuator, and BLAST is testing a shutter for their cryostat (apparently there are times during their flight where they expect to be pointed toward the sun...and the sun focused through a 1.8-meter mirror generates a pretty high power density which would easily melt the window of their cryostat). On the late shift, Chappy and Joy will be working on testing scan modes while Kyle babysits the fridge cycle to ensure we have working cold detectors for tomorrow's tests.
Last, I took a peek around the last experiment that will be flying from Antarctica this year, SuperTIGER. If you're too lazy to click on the link, it's a heavy-ion cosmic ray detector with an aim to help constrain the possible sources of high energy cosmic rays by measuring the ratios of the various elements that make up cosmic rays. I took some pictures, and like the BLAST album, it will be updated as necessary but probably won't be mentioned on this blog much: https://picasaweb.google.com/104253244018605213307/SuperTIGER2012.
Pictures:
https://picasaweb.google.com/104253244018605213307/EBEXInPalestine20120710
On the gondola side, Britt and Michele started setting up hardware in the Bemco for a test of the new power system's electronics and batteries. In addition, they are going to test the inner frame lock pin and the spare elevation actuator, and BLAST is testing a shutter for their cryostat (apparently there are times during their flight where they expect to be pointed toward the sun...and the sun focused through a 1.8-meter mirror generates a pretty high power density which would easily melt the window of their cryostat). On the late shift, Chappy and Joy will be working on testing scan modes while Kyle babysits the fridge cycle to ensure we have working cold detectors for tomorrow's tests.
Last, I took a peek around the last experiment that will be flying from Antarctica this year, SuperTIGER. If you're too lazy to click on the link, it's a heavy-ion cosmic ray detector with an aim to help constrain the possible sources of high energy cosmic rays by measuring the ratios of the various elements that make up cosmic rays. I took some pictures, and like the BLAST album, it will be updated as necessary but probably won't be mentioned on this blog much: https://picasaweb.google.com/104253244018605213307/SuperTIGER2012.
Pictures:
https://picasaweb.google.com/104253244018605213307/EBEXInPalestine20120710
Monday, July 9, 2012
Day 43, 7/9/2012 -- Stormy weather
Last night, Kyle stayed in the high bay overnight to make sure the fridge cycle went off without any issues -- and it's a good thing too, because due to some files not having been updated correctly, the detectors wouldn't have been tuned. Because of Kyle's vigilance, he was able to tune the detectors by hand and put us in a good position this morning to take some measurements.
The goal for today was to take some more spectral measurements at 250 and 410GHz. I started at 410, since that's how the spectrometer was set up already, but was having no luck finding the signal. It was only later, after switching the hardware for 250 GHz measurements, that I had the grating in completely the wrong position, so it's no wonder I didn't see anything. Still, the 250GHz measurements were on track for going much more smoothly (we found a detector with a whopping big signal)...and then I broke the motor for the chopper wheel. After a frantic bit of hunting around for the replacement motors, we finally were able to take some data.
We had a pretty massive downpour today, which caused the power to go out -- but luckily, we now have the whole bolo system running off of a UPS, so we didn't lose detector biases and were able to continue with measurements without much delay. Awesome!
On the logistical front, today we had a long meeting trying to figure out our schedule for the rest of the integration -- mostly, how long do we keep doing these spectral measurements before putting the cryostat on the gondola. Right now it looks like we have just a couple more days to wrap up these measurements.
On a blogistical note, it's getting harder for me to know of who all is doing what around the high bay, especially as there are few visible changes (the gondola's mostly put together and the receiver looks the same as always), and people are now working different schedules to try and make the most efficient use of time. Thus it's hard to keep track of what's going on without wandering around and asking people -- which is tough when I've got work to do! So of course all of my updates focus on receiver stuff since that's what I'm working most directly on. C'est la vie.
Finally, we had another collaboration member join us -- Amber, the EBEX Co-I from Columbia, arrived with her newborn baby and husband in tow.
Pictures:
https://picasaweb.google.com/104253244018605213307/EBEXInPalestine20120709
The goal for today was to take some more spectral measurements at 250 and 410GHz. I started at 410, since that's how the spectrometer was set up already, but was having no luck finding the signal. It was only later, after switching the hardware for 250 GHz measurements, that I had the grating in completely the wrong position, so it's no wonder I didn't see anything. Still, the 250GHz measurements were on track for going much more smoothly (we found a detector with a whopping big signal)...and then I broke the motor for the chopper wheel. After a frantic bit of hunting around for the replacement motors, we finally were able to take some data.
We had a pretty massive downpour today, which caused the power to go out -- but luckily, we now have the whole bolo system running off of a UPS, so we didn't lose detector biases and were able to continue with measurements without much delay. Awesome!
On the logistical front, today we had a long meeting trying to figure out our schedule for the rest of the integration -- mostly, how long do we keep doing these spectral measurements before putting the cryostat on the gondola. Right now it looks like we have just a couple more days to wrap up these measurements.
On a blogistical note, it's getting harder for me to know of who all is doing what around the high bay, especially as there are few visible changes (the gondola's mostly put together and the receiver looks the same as always), and people are now working different schedules to try and make the most efficient use of time. Thus it's hard to keep track of what's going on without wandering around and asking people -- which is tough when I've got work to do! So of course all of my updates focus on receiver stuff since that's what I'm working most directly on. C'est la vie.
Finally, we had another collaboration member join us -- Amber, the EBEX Co-I from Columbia, arrived with her newborn baby and husband in tow.
Pictures:
https://picasaweb.google.com/104253244018605213307/EBEXInPalestine20120709
Sunday, July 8, 2012
Day 42, 7/8/2012 -- A wretched hive of scum and villainy
The EBEX bolo system power crates, that is -- designed years ago, they are probably the worst-laid-out piece of major equipment on the experiment. One of them is, anyway -- power crate 1, which houses DC/DC converters for half of the bolo system, the housekeeping system, the bolo side network, and a general housekeeping board which, among other things, controls various parts of the HWP system). Needless to say, this crate is very crowded, which means that we try as hard as we possibly can to not mess with it, lest we be forced to delve into the bowels of the crate.
Well, we were forced to. In order to try and solve a nagging DfMUX board power issue, we had to swap out the DC/DC voltage setting resistors for the +/- 5.8V power system, which entailed opening up the crate (as much as we could) and swapping out these resistors to drop the voltage by about 200mV. Along the way, we found that a power return wire for one of the DC/DCs was no longer connected and was subsequently fixed.
Power crate fixes, though, happened at the end of the day (we are just wrapping up now, at midnight). During the day, we were able to take spectral measurements for two 410GHz detectors. Kate and Kevin are now on the 'early' shift (7AM - ~4PM), so they could get some time with the DfMUX system without me and Kyle trying to get data.
The gondola crew spent much of today doing gyro tests, calibrating each individual gyro (there are six total, two full three-axis redundant gyro boxes) by swapping each gyro to a position where it would sense elevation motion and doing careful elevation slews. Britt worked on a little electronics board for the solar power system, and Michele worked on straightening out a small ding in our spare actuator's outer housing tube.
Pictures:
https://picasaweb.google.com/104253244018605213307/EBEXInPalestine20120708
Well, we were forced to. In order to try and solve a nagging DfMUX board power issue, we had to swap out the DC/DC voltage setting resistors for the +/- 5.8V power system, which entailed opening up the crate (as much as we could) and swapping out these resistors to drop the voltage by about 200mV. Along the way, we found that a power return wire for one of the DC/DCs was no longer connected and was subsequently fixed.
Power crate fixes, though, happened at the end of the day (we are just wrapping up now, at midnight). During the day, we were able to take spectral measurements for two 410GHz detectors. Kate and Kevin are now on the 'early' shift (7AM - ~4PM), so they could get some time with the DfMUX system without me and Kyle trying to get data.
The gondola crew spent much of today doing gyro tests, calibrating each individual gyro (there are six total, two full three-axis redundant gyro boxes) by swapping each gyro to a position where it would sense elevation motion and doing careful elevation slews. Britt worked on a little electronics board for the solar power system, and Michele worked on straightening out a small ding in our spare actuator's outer housing tube.
Pictures:
https://picasaweb.google.com/104253244018605213307/EBEXInPalestine20120708
Saturday, July 7, 2012
Day 41, 7/7/2012 -- Dealing with things not working
We came in today to warm cold stages -- this time, neither of our fridge cycle commands worked overnight. After debugging in the morning by Seth, we started new fridge cycles around noon. Most of Kyle's day was spent analyzing old data while Kevin and I worked on debugging issues in the readout electronics. Kyle, Cynthia, and I are back in the high bay at ~9:30PM to try and start a scan and hopefully get some data tonight.
The gondola had its legs attached and the team is doing some initial shakedown tests.
In addition, Kate returned to Palestine, this time with her 1-year-old daughter in tow. Kate and Kevin plan on working out detector issues in the ~week that Kate will be down here.
Pictures (not many):
https://picasaweb.google.com/104253244018605213307/EBEXInPalestine20120707
The gondola had its legs attached and the team is doing some initial shakedown tests.
In addition, Kate returned to Palestine, this time with her 1-year-old daughter in tow. Kate and Kevin plan on working out detector issues in the ~week that Kate will be down here.
Pictures (not many):
https://picasaweb.google.com/104253244018605213307/EBEXInPalestine20120707
Friday, July 6, 2012
Day 40, 7/6/2012 -- Gondola the White returns
Today's big event was the joining of the inner and outer frames and the mounting of our cryostat mass replacement, the so-called cryodummy. Basically, because of all the work the gondola crew did on mounting electronics and other hardware when the two were apart, now that everything is back together they are ready to hang and start doing scan tests!
On the receiver side, we had a partially botched fridge cycle (our 1K fridge didn't cycle at all), so that limited the amount of data we could take. Still, we managed to get some. On the downside, one of our DfMUX boards let out some of its magic smoke (from a capacitor). After a little investigation, the cause was found and it will be fixed forthwith. The fridges shall be cycled again tonight (with the issue that prevented last night's cycle found and corrected), so we should be good to go again tomorrow.
Pictures:
https://picasaweb.google.com/104253244018605213307/EBEXInPalestine20120706
On the receiver side, we had a partially botched fridge cycle (our 1K fridge didn't cycle at all), so that limited the amount of data we could take. Still, we managed to get some. On the downside, one of our DfMUX boards let out some of its magic smoke (from a capacitor). After a little investigation, the cause was found and it will be fixed forthwith. The fridges shall be cycled again tonight (with the issue that prevented last night's cycle found and corrected), so we should be good to go again tomorrow.
Pictures:
https://picasaweb.google.com/104253244018605213307/EBEXInPalestine20120706
Thursday, July 5, 2012
Day 39, 7/5/2012 -- Everything's coming up Milhouse
After the past few days of battling with electronics and fridge issues, it was a refreshing and welcome change to come in to the high bay this morning with everything working. We are taking more polarized Ebert-Fastie data, and indications so far are that we can use data taken during the polarized scans to get both polarization data and overall power spectral response information, which will make our data gathering twice as efficient!
Kyle returned from Minnesota late yesterday, bringing with him a new UMN grad student, Cynthia, who's here to help out where possible and gain experience in the field. One of the first things Kyle noticed when arriving at the high bay was that the mirrors had been put on the inner frame -- at which point he pointed out that we needed to align the mirror mounts first. And aligning the mirror mounts requires having the cryostat on the gondola, as the mirror mounts (six-legged contraptions known as "hexapods" or "Stewart platforms") are aligned relative to the optics inside the cryostat. So, off they came.
But the gondola team got plenty of other stuff done today: They mounted the trunnion bearings, mounted the flight computer and ACS crates, and wrapped the flight ropes (those sexy lavender beasts) with red balloon wrap to protect against abrasion and other damage.
Pictures:
https://picasaweb.google.com/104253244018605213307/EBEXInPalestine20120704
Kyle returned from Minnesota late yesterday, bringing with him a new UMN grad student, Cynthia, who's here to help out where possible and gain experience in the field. One of the first things Kyle noticed when arriving at the high bay was that the mirrors had been put on the inner frame -- at which point he pointed out that we needed to align the mirror mounts first. And aligning the mirror mounts requires having the cryostat on the gondola, as the mirror mounts (six-legged contraptions known as "hexapods" or "Stewart platforms") are aligned relative to the optics inside the cryostat. So, off they came.
But the gondola team got plenty of other stuff done today: They mounted the trunnion bearings, mounted the flight computer and ACS crates, and wrapped the flight ropes (those sexy lavender beasts) with red balloon wrap to protect against abrasion and other damage.
Pictures:
https://picasaweb.google.com/104253244018605213307/EBEXInPalestine20120704
Wednesday, July 4, 2012
Day 38, 7/4/2012 -- Fourth of July
Today we spent time dealing with bolo electronics -- an unexpected reboot of the crates overnight meant that the overnight tuning didn't work, and later we had some other board issues that we've decided to debug more fully before proceeding further. That took up most of the day for myself, Jeff, and Kevin. In addition, Jeff has spent a lot of time refining his data analysis of our polarized Ebert-Fastie data.
The gondola team has made great progress today, mounting both mirrors and the primary mirror protection rollbar along with a few other ancillary pieces of gondola hardware (gyro box, star camera mounts, elevation actuator, etc). Tomorrow they plan on setting the inner frame atop the outer frame, joining the two major pieces of the gondola together again.
In other news, I've decided to move all BLAST-Pol pictures into a separate web album to avoid confusion with EBEX hardware. I will continue to update it but I probably won't post the link here again unless there's something particularly notable. You can see that album here:
https://picasaweb.google.com/104253244018605213307/BLAST2012
Today's (EBEX) pictures:
https://picasaweb.google.com/104253244018605213307/EBEXInPalestine20120704
The gondola team has made great progress today, mounting both mirrors and the primary mirror protection rollbar along with a few other ancillary pieces of gondola hardware (gyro box, star camera mounts, elevation actuator, etc). Tomorrow they plan on setting the inner frame atop the outer frame, joining the two major pieces of the gondola together again.
In other news, I've decided to move all BLAST-Pol pictures into a separate web album to avoid confusion with EBEX hardware. I will continue to update it but I probably won't post the link here again unless there's something particularly notable. You can see that album here:
https://picasaweb.google.com/104253244018605213307/BLAST2012
Today's (EBEX) pictures:
https://picasaweb.google.com/104253244018605213307/EBEXInPalestine20120704
Tuesday, July 3, 2012
Day 37, 7/3/2012 -- Not awesome
Today was kind of a bust in terms of getting any real data. Last night after dinner, Seth and I went back to the high bay to do a simple fix on one of the "general housekeeping" boards in the system that lives in one of the bolometer power crates. Turns out that after we reconnected everything, the cryostat temperature readouts stopped working. And I was informed of this at approximately 1AM. So I went back to the high bay to try and fix it, was thoroughly unsuccessful, Seth tried to debug the issue in the morning before we got in, and we finally tracked it down to connecting mislableled connectors on the power box the way they were indicated -- i.e. incorrectly!
After fixing the labels, we then set in motion a new 'schedule file' for the bolometer system that would automatically put the detector array into a nearly-operational state. Of course, this didn't work completely initially, leading to some time spent debugging. And then the focal plane was taking forever to cool...partially because one of the fridges ran out. Even so, we pushed ahead and tried to get some data as the detectors were still quite cold...but we ended up not being able to get any usable calibration data today. Major bummer. On the plus side, Jeff was able to make some progress on the data analysis for our calibration scans giving us some more confidence that our data is of good quality.
The gondola team continues to make progress; now that the Bemco testing is done they have started to reassemble the entire gondola. A continuing discussion with CSBF revolves around placement and protection of their SIP LDB electronics package, and I believe they are converging on a solution.
Pictures:
https://picasaweb.google.com/104253244018605213307/EBEXInPalestine20120703
After fixing the labels, we then set in motion a new 'schedule file' for the bolometer system that would automatically put the detector array into a nearly-operational state. Of course, this didn't work completely initially, leading to some time spent debugging. And then the focal plane was taking forever to cool...partially because one of the fridges ran out. Even so, we pushed ahead and tried to get some data as the detectors were still quite cold...but we ended up not being able to get any usable calibration data today. Major bummer. On the plus side, Jeff was able to make some progress on the data analysis for our calibration scans giving us some more confidence that our data is of good quality.
The gondola team continues to make progress; now that the Bemco testing is done they have started to reassemble the entire gondola. A continuing discussion with CSBF revolves around placement and protection of their SIP LDB electronics package, and I believe they are converging on a solution.