Thursday, June 7, 2012

Day 11, 6/7/2012 -- leak free!

Today we switched out the cryostat roughing pumps for turbo pumps in order to go to the next stage in the cryostat pumpout process. After that, Jeff and Kyle installed the SQUID controller boards onto the bottom of the (inverted) cryostat. We also gave an update on our progress on our weekly collaboration telecon -- all before lunch!

After lunch, Jeff and I headed over to the rigging shop to finish our aerial lift, forklift, and fall protection safety courses, which took basically the entire rest of the afternoon. During that time, Kyle gave a tour of our experiment to a group of about 50 10th-grade girls who were visiting CSBF as part of a summer engineering camp at UT Tyler.

After Jeff and I returned from our training session, we found Kyle working on a new timing cable to synchronize the timestamps across all of our bolometer readout boards while Franky and KyleH finished up the last tasks necessary to complete the heatsinking of said readout boards. At the end of the day, the cryostat was pumped down low enough to allow us to leak-check -- and no leaks were found! We will leak check again tomorrow after having allowed the cryostat to pump out even further, but we anticipate no further problems delaying us from cooling the cryostat this weekend.

Also, here's the news clip from KLTV that aired yesterday:
http://www.kltv.com/story/18722584/nasa-funded-experiment-comes-to-etx

And today's pictures:
https://picasaweb.google.com/104253244018605213307/EBEXInPalestine20120607

Wednesday, June 6, 2012

Day 10, 6/6/2012 -- Pumpin', Pumpin'

The cryostat is closed! We did the last measurements and installed the optics stack filters and window in the morning, Jeff ran the last of the half-wave-plate checks before noon, we installed the instrument around noon, installed SQUIDs and connected cables in the afternoon, and got the shells closed early evening. Right now the roughing pumps are humming away.

During the afternoon, we were visited by a news correspondent from KLTV, a local TV station based out of nearby Tyler, TX. The correspondent chatted with us, took some video of us working on the instrument, and sat down with me for an interview where she, of course, asked about the truck saga as well as the science behind what we're trying to accomplish with EBEX. It was fun, and I'll add a link to the online video when I have it.

Pictures from today:
https://picasaweb.google.com/104253244018605213307/EBEXInPalestine20120606

Tuesday, June 5, 2012

Day 9, 6/5/2012 -- More alignment!

Today we managed to finish the last of the true cryostat alignment tasks (what remains is measuring reference positions to be used in later analysis) -- aligning the uppermost lens in our optical system (the so-called "field lens" which is mounted separately from the other lenses. After finishing that alignment, we removed the instrument (whose sole purpose in the field lens alignment operation was to provide a set of reference points to align to) and Jeff spent the rest of the afternoon installing the HWP system. Tomorrow we plan on re-installing the instrument for the final time, installing SQUIDs, connecting cables, and closing up radiation shields before flipping the cryostat for one last time to make the final reference measurements and install the optics stack filters and window. So close!

In other news, we got a shipment of liquid helium today -- 1000 liters! That should last us at least a few days...

In other other news, today marks the beginning of the transit of Venus across the face of the Sun. The next opportunity to observe this is in 105 years, so don't miss the chance! Check with your local university astronomy department; I'm sure they will have some public viewings arranged (don't look directly at the Sun!!). Here's one of my pictures, taken through shade 10 welding glass:


Pictures:
https://picasaweb.google.com/104253244018605213307/EBEXInPalestine20120605

Monday, June 4, 2012

Day 8, 6/4/2012 -- Getting closer to closing

Today was another productive day in the high bay. Jeff and I started out by taking some CMM measurements of the half-wave plate system outside the cryostat to figure out reference positions for things like the optical encoder photodiodes. We then put the whole system in the cryostat to make some measurements of the HWP mount relative to the cryostat but then realized we went out of order -- we had to take those measurements first, without the HWP in the system, otherwise our reference points are obscured by the rotating part of the assembly. So, out it came, the rotor was removed from the HWP table, and the table was then reinstalled into the cryostat to do the measurements. Then the HWP table was removed, the HWP rotor reinstalled, and the first set of measurements we did was re-done.

I divided up my time by helping Kyle finish the assembly of the instrument. We first installed all the 1 Kelvin shielding on the optics box, a process which involves copious amounts of aluminum foil tape. Then, once that was done, the sub-Kelvin fridges were finally mounted to the cold plate and their heatsinking installed. Kyle did some final wire checks and the instrument was finally done!

Next comes more alignment -- this process involves installing the instrument into the cryostat and aligning the final lens which lives in the cryostat optics stack (the silver cylindrical protrusion atop the big blue cylinder of the cryostat). Then, we remove the instrument, the HWP system goes in for the final time, then the instrument goes back in for the final time, then we install SQUIDs and connect cables, close up the bottom of the cryostat, flip the cryostat over, make some final measurements with the CMM, put the window back on, make more measurements, and then...pump! Sounds like a piece of cake, right?

Pictures:
https://picasaweb.google.com/104253244018605213307/EBEXInPalestine20120604

Sunday, June 3, 2012

Day 7, 6/3/2012 -- Alignment

Optics alignment is one of the dreaded tasks in closing up the EBEX cryostat. The procedure relies on using an articulated measuring arm to measure various locating points on the various optical components and then trying to adjust the positions and angles of these components so they meet our specifications. More often than not, this goes relatively smoothly. But sometimes...well, sometimes it doesn't. And when it doesn't it's possible to spend hours running in circles, chasing a seemingly unattainable tail.


Thankfully, today was mostly the former. After having set up the arm yesterday, Kyle and I started the task of actually doing the measurements and adjusting the optics. After a few false starts (due to tooling balls that had shifted in their holes and flex in the arm's mounting, both easily fixed), we managed to get nice, predictable results for the first three lenses we aligned. The last component, the polarizing grid, gave us some problems with some strange behavior when we tried to adjust it, but eventually it, too, succumbed to its inexorable, inevitable, aligned fate. This took up most of the day for myself and Kyle. During some stretches while Kyle was puzzling over confusing data, I was able to finish assembling our 77K optical filter stack, which helps prevent infrared radiation from penetrating into the depths of the cryostat and shortening our liquid helium hold time.

Today also marked the arrival of a new addition to the EBEX high bay personnel -- another Kyle, this one a grad student from collaborator Brown University, arrived in Palestine late last night and met us at the high bay in the morning. Due to the obvious potential for confusion between Kyle and, uh, Kyle, I shall dub the new Kyle as KyleH. KyleH's arrival was fortuitous, as Franky was starting to get bogged down with both doing the heatsinking of the DfMUX boards as well as testing them. So Franky put KyleH to work gluing heatsinks while he focused on testing. Jeff's day was spent finishing up some HWP hardware and then working with Seth from Columbia on getting HWP system commanding through our flight control software working. Which, seemingly, it now does!

Pictures:
https://picasaweb.google.com/104253244018605213307/EBEXInPalestine20120603

Saturday, June 2, 2012

Day 6, 6/2/2012 -- Saturday in the high bay

Those familiar with this blog will recall that weekends don't really exist for us when we're in the field -- every day is a high bay day, and today is no exception. Kyle continued assembling the instrument, working in particular on mounting the other focal plane, while Jeff continued work on the HWP subsystem. Franky kept plugging away at DfMUX board heatsinking and setting up the readout system, and I finished up refitting the o-rings in the double window system and flight-readying some cables that were decidedly not flight ready before (no strain reliefs, no chafe protection). I also ended up machining some parts for Jeff -- new mounts for the LEDs and photodiodes used in the optical encoder system for the HWP:



By the end of the day, we reached a point where we are ready to install and start aligning optics in the instrument and start installing HWP system components into the cryostat. Not bad progress for a "weekend".

Pictures:
https://picasaweb.google.com/104253244018605213307/EBEXInPalestine20120602

Friday, June 1, 2012

Day 5, 6/1/2012 -- That's more like it

Today was much the same as yesterday: Kyle worked mostly on getting the focal planes ready to be installed into the instrument, Jeff worked on half-wave-plate parts and some changes to flight computer code (with remote help from Seth at Columbia), and Franky continued to work on DfMUX heatsinking. I ran some errands in the morning (to buy some ladders to replace the ones taken) and in the afternoon started work on refitting the o-rings on the EBEX double window system.

I probably haven't mentioned the double window before at all in any previous editions of the EBEX in Flight blog. In the past, EBEX has used a single thick but rather absorptive window due to the huge amount of pressure trying to force the window inwards into the cryostat. The double window, as the name implies, has two windows -- a thick one for ground operations in order to resist the relative pressure between outside and inside the cryostat and a much thinner window for use at float altitude where the pressure differential is much smaller. While we don't plan on using the sliding functionality until we actually fly from Antarctica, this year's Palestine integration will mark the first time the double window will actually be installed on the cryostat (previous testing was with the system in isolation) and will give us the first opportunity to figure out whatever new challenges come from adding this new system.

Pictures:
https://picasaweb.google.com/104253244018605213307/EBEXInPalestine20120601#

Thursday, May 31, 2012

Day 4, 5/31/2012 -- Finally, a start

The past three days have been quite a strange experience. If you want to find out more, you can just google "missing nasa truck" and you can probably find any number of articles from both Texan and Minnesotan news sources, so I won't go into it here. I did have the pleasure of being interviewed live via Skype on WFAA Dallas, as well as having a phone interview with Minnesota Public Radio (alas, my quotes apparently weren't compelling enough to make it to the final segment). And I have spent more time on the phone the past 3 days than I have the whole year to date.

But, finally, we got our experiment and we started unloading it this morning. Turns out there were a few things missing from the trailer (my ~$1500+ bike, Jeff's ~$800 bike, some ladders, and, of all things, a crappy box fan), but all of the stuff that's actually hard to replace is still here.

There's some evidence that the trailer had a bit of a wild ride, as some screws inside the cryostat that haven't loosened during multiple previous shipments seemed to have somehow vibrated loose. In one case, this caused another screw to act as a file and cut a nice (but inconsequential) gouge in the aluminum structure that holds one of the 1K lenses.

It was nice, though, to finally be able to get to work doing what we came down here to do: Put together our receiver and get it cold! We started of course by setting up the lab area -- Jeff and Franky started setting up computers while Kyle and I worked on getting the cryostat open and the 'instrument' (the innards of the receiver that holds the cold lenses, detectors, and sub-Kelvin refrigerators) out. At that point, Kyle had to figure out some computer networking issues, Franky started doing some work on the DfMUX (Digital frequency-domain MUltipleXing) detector readout boards, Jeff started working on the half-wave plate system reassembly, and I worked on getting the sub-K fridges unpacked and started the buildup of the instrument. We made a lot of good progress today, and I'm happy to say that we're finally solving the sorts of problems that we're used to having, rather than the madness of the past 3 days!


And, of course, pictures!
https://picasaweb.google.com/104253244018605213307/Palestine20120531

Update: Truck found!

We have our stuff, we're unpacking now. Hooray!

Tuesday, May 29, 2012

Day 2, 5/29/2012 -- Dude, Where's my Truck?

Still no truck. I'm not going to go into details here, but we're starting to get worried.

And no pictures today either.