Monday, July 2, 2012

Day 36, 7/2/2012 -- Bemco day!

Today's big event (for us) was the ACS team testing a whole bunch of stuff in CSBF's Bemco environmental test chamer that replicates the conditions during various phases of the flight. Despite a slow start, they managed to get all of their testing done in one day, which means they can now start putting the gondola back together.

On the receiver side, Jeff and I continued to do polarized Ebert-Fastie scans. We need statistics, sue us.

The other big news around the base is that one of the other payloads, BLAST-Pol, showed up. One of the early BLAST (pre -Pol) blogs was my inspiration for doing an EBEX blog, and now they're just across the building from us in the west high bay (sadly, where the badminton court was). In addition, EBEX's gondola design is in some ways derived from BLAST's, so don't be surprised if you see similarities between the two in the pictures.

Pictures:
https://picasaweb.google.com/104253244018605213307/EBEXInPalestine20120702

Sunday, July 1, 2012

Day 35, 7/1/2012 -- Couldn't think of a title!

Today started off not particularly well -- we had set the fridges to cycle overnight so we wouldn't be caught with a fridge that ran out in the middle of taking data. This all worked perfectly fine, except we noticed that one of the fridges started warming up immediately after we got in to the high bay in the morning. It was then that we realized we forgot a crucial step in the cycling process. Because the cryostat will, on average, live tilted 25 degrees off vertical during flight, the fridges inside are mounted so that they will be vertical when the cryostat is tilted 25 degrees. When the cryostat is NOT tilted, the fridge cycle...doesn't really work (due to the geometry of the particular fridges we use). And, well, we forgot to tilt the cryostat last night before we left.

So we ended up running the fridge cycle again this morning, at 9AM after tilting the cryostat. And the fridge cycle takes about 5.5 hours just to run...and then a few more hours before the focal planes are stable at their base temperatures, which is necessary before we can start working with the detectors. Which basically meant that for me and Jeff, our day was completely shot in terms of taking receiver calibration data. However, we did manage to make some parts to upgrade the Ebert-Fastie: we use a servo-controlled mechanical chopper wheel to modulate the signal coming out of the Ebert-Fastie. However, we noticed that the chop frequency wasn't always very stable, so Jeff had the idea to try coupling the chopper wheel to a stepper motor rather than a servomotor. This ended up being surprisingly easy, since Jeff had on hand some small stepper motors that had the same shaft size as the servomotor, and a spare stepper motor controller. All that needed to be done was to wire up the controller (Jeff's task) and make a new motor mount (my task). And, lo and behold, it all works! It looks like the chopper is MUCH more stable with a stepper motor driving it.

Elsewhere in the high bay, the ACS team continues to work on getting things ready to Bemco test. They have now reassembled the star cameras and disk pressure vessels and purged them with dry nitrogen before sealing them. And Andrei and KyleH did initial tests of wrapping the BTS with its aluminized mylar skin.

In the next few days, the other payloads headed to Antarctica will be showing up, so we had to move all of our miscellaneous stuff out of the west high bay and find a home for it in our high bay.

Pictures:
https://picasaweb.google.com/104253244018605213307/EBEXInPalestine20120701

Saturday, June 30, 2012

Day 34, 6/30/2012 -- more of the same

Today was more of the same -- After refilling the cryostat's helium, Jeff and I did more polarized Ebert-Fastie scans (at both 150 and 250 GHz), the Columbia crew did more painting of ACS bits in preparation for environmental testing in the CSBF Bemco test chamber, and the Kevins did more work characterizing the array. The Kevins, in particular, have switched to a somewhat later shift in order to get some quality time with the array when we aren't taking receiver calibration data. KyleH started doing some setup work for the sun sensors, pictures of which can be seen in today's album.

As a bonus, I took a short video of the EBEX HWP motor spinning. Ok, it's not that exciting, and the white balance is off, but it's only 8 seconds so it's not much of a commitment:
http://www.youtube.com/watch?v=efzZ6rsbimM

Pictures:
https://picasaweb.google.com/104253244018605213307/EBEXInPalestine20120630

Friday, June 29, 2012

Day 33, 6/29/2012 -- More scans, more paint

Today Jeff and I set up the Ebert-Fastie to do scans to map the phase response of the EBEX achromatic HWP. Unlike regular single plate HWPs, which are tuned to a specific frequency and its multiples, the EBEX AHWP is a stack of 5 birefringent plates oriented in such a way as to increase their bandwidth. The penalty for this is that the so-called 'phase response' is no longer a simple function -- for a given input polarization angle, the output polarization angle varies slightly as a function of frequency. We need to know this effect in order to properly analyze our data, and so by putting a polarizing grid at the output of the Ebert-Fastie and rotating the HWP, we can map the phase response of the HWP to polarized light as a function of frequency. After a few fits and starts, we managed to get the scans going by the early afternoon and have three full scans in the can with more to come tomorrow.

On the gondola side, Michele managed to get the elevation actuator completely disassembled and proceeded to degrease the various parts in the ultrasonic cleaner. Britt, Andrei, and KyleH started the process of painting various gondola bits that weren't powdercoated, and Chappy, Joy, and Seth continued their software work which results in an impressive amount of clacking on keyboards but doesn't make for very interesting blog posts.

Kate and Kyle left today; Kyle will be returning next week after a short break from Texas.

Pictures:
https://picasaweb.google.com/104253244018605213307/EBEXInPalestine20120629

Thursday, June 28, 2012

Day 32, 6/28/2012 -- The gondola returns

Today was another full day in the high bay. The big news is that the gondola has returned from powdercoating wearing its new outfit of lustrous white powdercoat. Britt and Michele spent some time this afternoon removing the masking from the holes we didn't want coated. In other gondola news, KyleH and Andrei worked on the triangle's shock absorption system on the BTS (which is intended to prevent the triangle from crashing down into the telescope on termination and landing). Michele also started disassembling our spare elevation actuator in order to degrease it and then regrease it with low-temperature grease (we use Dow-Corning Molykote33 Light, an aviation grease).

On the receiver side, we started getting set up to do polarized spectral response measurements to map out the HWP's phase response as a function of frequency. So, the HWP was ungripped, I helped Jeff make some electrical isolation pieces to isolate the motor from the cryostat, and the HWP was set spinning. It was at that point that we found the HWP position encoder readout boards weren't really reading out anything at all. After a few hours of troubleshooting, Jeff installed a spare ADC board (the so-called "mezzanine" boards of the DfMUX system) and everything worked again. We have some theories as to why the other mezzanines didn't work that we'll be investigating here. Now that everything is working again we hope to take some data tomorrow.

Kyle spent most of the day working on getting mirror alignment targets ready for eventual mirror installation and alignment on the gondola. Both he and Kate are leaving tomorrow, so he just wanted to tie up some loose ends before going back to MN. I forgot to mention in the last post that that, in addition to the gondola crew, Franky was replaced by Kevin a bit over a week ago, and a postdoc from McGill (also named Kevin, hereby known on the blog as KevinB) arrived yesterday. Kevin and KevinB spent a fair fraction of today setting up a new computer, christened 'hepburn' after the UMN group's recent theme of dead actor/actress computer names (joining monroe, mcqueen, and lamarr), that we bought for bolo streaming/visualization work.

Pictures:
https://picasaweb.google.com/104253244018605213307/EBEXInPalestine20120628

Wednesday, June 27, 2012

Day 31, 6/27/2012 -- ...And we're back!

Yes, I have returned to Palestine, so the blog will now resume! In my absence, many things have changed: The cryostat has been running fully cold, and fridge cycles are going smashingly well (getting cold, lasting a long time). The bolo gang has been hard at work getting the detectors up and running, doing characterization, and getting detectors tuned so that we can take calibration data. Over the past few days, the team has started taking spectral response data with our Ebert-Fastie monochromator, getting nice results in all bands.

In addition, the gondola team (Britt, Michele, Joy, and Chappy from Columbia, and Andrei and KyleH from Brown) has arrived. They have set up their lab area on the north end of the high bay and have the flight computers and attitude control system (ACS) running on the bench. The gondola itself is off being powdercoated by a local vendor, and the baffle-triangle support (BTS) structure is assembled in the other high bay, awaiting its eventual mylar wrapping which will serve to shield the experiment from the sun while at float.

I showed up today after a very early flight, so it'll take me a little while to catch up on the goings-on here. Suffice to say that things are progressing nicely!

Pictures:
https://picasaweb.google.com/104253244018605213307/EBEXInPalestine20120627

Wednesday, June 13, 2012

Day 16, 6/12/2012 -- Cooling

The cryostat continues to cool as it boils off helium at a copious rate. After 4 fills today (at ~150L of helium used apiece), the boiloff is now settling down -- the overnight fill should last for about 10-12 hours. The optics box was at about 65K in the evening; once it reaches about 40K the cooling rate increases and cools to near 10K relatively quickly. At that point, the fridges are cycled to cool the optics box and focal planes the rest of the way to 4K (and below).

This will be my last EBEX blog update for a while. I'm returning to Minnesota while Kate is coming here to help with detector work and calibration measurements for the next few weeks. I will take over Kate's job in MN of testing new detector wafers. I'll likely be back in Texas toward the end of June.

No pictures today, as everything in the high bay is pretty copacetic at the moment.

Monday, June 11, 2012

Day 15, 6/11/2012 -- Of Helium and Half-wave Plates

Unlike yesterday (which was so slow that I spent the afternoon at the apartment and didn't bother taking any pictures or posting), today was a virtual whirlwind of activity.

First, we were joined by Shaul, back from his sabbatical in Israel, and ready to PI the heck out of the project. Second was Ilan, who is stopping by Palestine (also from Israel) for a few days on his way to a conference in Hawaii. But most importantly, we were joined by our most adored visitor: liquid helium. Inside the EBEX cryostat.


This morning started by pumping the small bit (~5" out of 28" filled on Saturday) of remaining liquid nitrogen in the helium tank into the nitrogen tank. Then, we started the helium transfer, which went smoothly. Now starts the arduous task of refilling the cryostat every ~6 hours until the boiloff starts do decrease -- and at 250L for the first fill and 150L per subsequent fill, now you understand why we had 2000L of liquid helium sitting around the high bay the past few days! We refilled once this afternoon around 4PM, Kyle and Ilan are filling again at ~9:30PM, and Jeff and I get the early morning shift at 3AM. After the first day, then the helium starts lasting longer -- 8 hours, then 12 hours, then a whole day, and soon thereafter reaches its steady-state hold time of ~14 days. Of course, that's when we start cycling fridges and doing detector work.

The other big success of the day was that the half-wave plate was successfully ungripped and rotated, which is sometimes a bit harrowing. But not this time!

Pictures:
https://picasaweb.google.com/104253244018605213307/EBEXInPalestine20120611

Saturday, June 9, 2012

Day 13, 6/9/2012 -- Nitrogen

Today's big event was flipping the cryostat over and starting the cooldown process. After flipping, we first unloaded a whole 160L dewar's worth of liquid nitrogen (minus boiloff over the past week or so) into the nitrogen tank. The next 160L dewar's contents went into the helium tank. A third was then emptied, and a fair amount from a fourth was then used to finish filling the LN2 tank. The helium tank was left with about 28" worth of helium, or about 90 liters of its full 130L volume. Most of this will boil off over the next ~2 days as the cryostat cools down, after which the remainder will be pumped into the LN2 tank in preparation for the helium fill.

Aside from that...a pretty slow day. I did some administrative stuff for our upcoming Antarctica trip while Kyle helped Franky with some clock cables (erroneously referred to as "timing cables" in the last post) to help debug some issues with the DfMUX clock distribution.

Pictures:
https://picasaweb.google.com/104253244018605213307/EBEXInPalestine20120609

Friday, June 8, 2012

Day 12, 6/8/2012 -- Break

Today was a bit of a change for us -- we all went in to the high bay at the normal time, but the UMN crew had very little to do as we wait for the cryostat to pump out. After taking care of a few odds and ends, the three of us (Jeff, Kyle, and myself) left the high bay while Franky and KyleH stayed to continue working on DfMUX board stuff.

We dropped Kyle off at the Redlands so he could do laundry and chill out while Jeff and I took a day trip to Tyler. Like last year, we visited the Caldwell Zoo, a modest but well-curated zoo in the heart of Tyler. While their lions and giraffes seemed to be MIA today, we got to see some fairly active white tigers and a number of other interesting beasts. After the zoo we headed to the downtown Tyler area which is surprisingly cute, with a reasonable number of shops and whatnot surrounding a central square. On the way back out from Tyler, we stopped at one of the ubiquitous roadside barbecue joints and got our brisket on.



Pictures:
https://picasaweb.google.com/104253244018605213307/EBEXInPalestine20120608